Tile Floor Installation Near Goose Creek & North Charleston, SC
Preparing for Tile Installation
- Clear the installation area of all furniture and objects.
- Ensure the installation area is climate controlled, maintaining indoor humidity between 45-65%.
- Plan for the removal and disposal of old flooring at least one day before the installation of your new floors.
- If removing old carpet, leave tack strips in place and remove staples from the floor.
- Prepare your existing subfloor or install a new one if necessary, ensuring it is clean and level for the installation process.

Day of Tile Floor Installation
After Tile Flooring Installation
After installation, ensure proper ventilation for 48-72 hours to dissipate any odors. Keep in mind that painted baseboards, woodwork, and paint may require touch-ups post-installation, which will be your responsibility if needed. Additionally, consider the possibility of doors not clearing the new floor after installation. You may need to enlist the help of a qualified carpenter to rehang or adjust your doors accordingly.